Notes for September


    Hang drywall
Radiance Barrier (rafter insulation)
Start Bricking (front)

    Bricking continues (front)
Tape and bed sheetrock, begin texturing
Cabinets installed (errors)
Got contract on current house

    Bricking continues (west and back)
Glass Block window, Master bath
Interior Trim (doors, base molding)
Attic Insulation (blown fiberglass)
Garage doors installed

    Finish bricking
More trim, stair work
Bathroom sinks
Back patio poured
Lot graded

    Interior Painting (wrong color)
Tile installation
Tree removal

 

 